Circuit Link
Set Contents
- Upper link
- Transverse link
Changes
To provide optimal camber angle, the transverse linkfs effective length has been extended (+4mm).
The position of the third link installation hole has been changed.* Change in alignment, on standard vehicle height (Designed value):
Before installation: -050f; after installation: -150f
* The figures above may vary by }0.45, depending on individual vehicle characteristics.
- When installing the Circuit Link Set, always change all left and right link at the same time. Replacing only one area will have a negative effect on suspension balance.
- We suggest that the tension rod set and front third link bushing should both be replaced with NISMO parts. Replacing only the link will not reveal the full performance potential of the suspension.
- For repairs, replace all the upper link on one side at the same time, as well as the tension rod bushings and upper link on the opposite side as well. In the case of an accident, damage to one area is likely to place severe stress on all the link; replacing only one part of the link will negatively effect the balance of the suspension.